Challenge
The site faced ageing infrastructure, escalating compliance exposure and growing operational demand. A multidisciplinary engineering response was needed to bring the facility back to a safe, reliable and future-ready state.
Solution
Cyntech led the design, integration and delivery across electrical, instrumentation, control systems and safety scope — coordinating directly with operations to keep the plant productive throughout.
Scope
- Detail engineering
- Specifications & datasheets
- Construction supervision
- Commissioning
- QA / QC
- Close-out & training
Outcome
Improved uptime, reduced operational risk and a documented platform ready for further digital integration.